Whitepaper

Owning Workday after go-live

A playbook for first-time customers: which decisions to keep in-house, which to outsource, and what the first twelve months after cut-over should look like.

Go-live is where most Workday programmes are declared a success. It is also where the people who built the system leave. This whitepaper is a playbook for the twelve months that follow, written for organizations running Workday for the first time.

Go-live is a handover

During implementation the partner holds the knowledge: why a business process has five steps, why a security group exists, what was traded off in the design workshops. Unless that knowledge moves to your own team, every later change starts with a discovery exercise.

Owning the system means being able to answer “why is it configured like this?” without a statement of work.

What to keep, what to outsource

The useful line does not run between tasks. It runs between decisions and labour.

Keep in-house

  • Process and policy decisions
  • The security and role model
  • Priorities in the backlog
  • The verdict on each release: adopt, wait or ignore

Can be outsourced

  • Configuration work
  • Integration build and monitoring
  • Regression test execution
  • Report building to your specification

The first twelve months

  1. Months 0 to 3: stabilise.Hypercare, a single intake for issues, and a weekly decision meeting that HR owns rather than attends.
  2. Months 3 to 6: your first release.Workday ships feature releases twice a year. Run the first one as a rehearsal: read the notes, assess the impact, test, decide.
  3. Months 6 to 9: optimise.Work through the backlog that built up during implementation, starting with what managers and employees complain about most.
  4. Months 9 to 12: take stock.Review the ownership model, the skills in the team and the support contract against what the year actually required.

Five signs you don't own your system yet

  • Nobody in HR can explain why a process is configured the way it is.
  • Every change request goes to the partner by default.
  • Release notes are read after the release, not before.
  • Reports are requested, never built.
  • The backlog is a list without an owner.

We measure success by how little you need us after go-live.

In the full whitepaper

  • An ownership model with roles for an HR systems team
  • A release calendar and checklist
  • Questions to ask an application-maintenance partner
  • A twelve-month plan you can adapt to your own programme

Request the whitepaper

Sample summary, written to show the format. Aim-Up replaces or edits it, and adds the whitepaper file, before launch.

Live on Workday, and now what?

Thirty minutes on your first twelve months and where ownership should sit.